Projexo Digital
Projexo Caisse
Projexo 360
Your business
Contact
Request a quote Call ES · +34 610 17 50 19Call FR · +33 6 13 77 39 47 info@projexo.solutions

Projexo Caisse

Making things that come from different systems work together.

Projexo connects your POS solution, your data and your equipment to avoid breaks and double entry.

What we doStudy, connect, migrate, check
With whomYour old system, your equipment, the publishers concerned
What you are left withA connected environment and migrated data
A till on a counter, connected by cables to the payment terminal, the printer and the scanner

What connects

Around the POS, not everything has the same status

A desirable connection is not an existing connection: each one here carries its real status.

At the centreYour POS solutionEverything that follows connects to it, or does not connect to it yet.
Direct connectionPayment terminal

The amount goes from the POS to the terminal, without being re-keyed. This is the connection that eliminates double entry.

Direct connectionReceipt and production printers

Each line goes to the station that prepares it: the destination is set during configuration.

Direct connectionCash drawer

Opened by the POS at the time of payment, or by the printer depending on the software.

Direct connectionScanners, scales, cash recyclers

The barcode or the weight goes straight into the sales line.

Announced by the publisherStock and catalogue

Managed by the POS software itself. What is available depends on the plan subscribed.

Announced by the publisherLoyalty and customer database

Announced by the three publishers, at different plan levels.

Announced by the publisherBooking and diary

At the heart of the beauty solution; to be studied elsewhere.

To be studied at the auditOnline shop

No connector is announced on this site until it has been verified for your platform.

By import or exportAccounting and invoicing

Most often by end-of-period export, taken into your accounting tool.

Announced by the publisherReports and management

Provided by the software. Export to a spreadsheet remains the most common route.

Direct connectionThe hardware plugs into the terminal and we check it on site.
Announced by the publisherPublished on the software's official pages. Remains to be verified for your configuration.
By import or exportNo automatic link: a file passes from one system to the other.
To be studied at the auditNothing is promised until feasibility has been verified on your premises.

Why we do not publish a compatibility list

A compatibility announced without having been tested on a real installation is a promise someone will have to keep on switchover day. Until we have connected a tool at a client's, it remains "to be studied" — and the study is part of the audit.

Data migration

From one system to the other, in seven stages

Migration is not improvised on switchover day: it is prepared and tested beforehand.

  1. Old system

    We look at what it contains and, above all, what it agrees to export. That limit decides everything else.

    What comes outAn inventory of what can be recovered

  2. Export

    The file comes out in the format the old tool offers — rarely the one we would have chosen.

    What comes outA dated source file

  3. Clean-up

    Duplicates, inconsistent labels, obsolete prices, dead items. What is no longer used is not migrated.

    What comes outA clean data set

  4. Field mapping

    Every column in the old system finds its place in the new one, or does not — and that is stated.

    What comes outA mapping table

  5. Test import

    On a test environment, never directly in production.

    What comes outA verifiable import

  6. Checking

    We count, we compare, we open records at random. Discrepancies are corrected before, not after.

    What comes outA discrepancy report

  7. Go-live

    The switchover, on a date chosen with you, once checking has passed.

    What comes outThe new system in service

Preparing and checking the data before a migration

What migration depends on

What the old system agrees to export, the quality of what it contains, the formats available and the new publisher's rules. These four points are verified at the feasibility study, and whatever cannot be migrated is announced before the switchover, never after.

Before / after

What a completed integration changes

The same hardware, the same software: what changes is what flows between them.

On arrival

  • The amount is re-keyed on the payment terminal
  • Items exist in two versions, in two tools
  • The accounting export is redone by hand every month
  • Every peripheral was plugged in by someone else
  • When a link breaks, nobody knows who to call

On leaving

  • The terminal receives the amount from the POS
  • A single reference catalogue, migrated and checked
  • An export in the format your accountant expects
  • Every link tested on the real terminal before going into service
  • A point of contact who connected the whole thing and knows it

These states describe a delivered installation, not a measured gain: we publish no percentage of time saved until it has been recorded at a client's and authorised by them.

Who does what

An integration brings several parties round the table

We coordinate: that does not mean we decide in their place.

You

What you provide or approve

  • Access to the old system and to the tools being kept
  • Current contracts: licences, payment, operator
  • Approval of the field mapping table
  • The choice of switchover date
  • Checking the data once migrated

Projexo

What we carry out

  • The feasibility study for each link
  • The inventory of connections required
  • Data preparation and clean-up
  • Testing before the switchover and checking afterwards
  • Coordination of those involved

Publisher or third party

What does not depend on us

  • The export formats of your old system
  • The new publisher's import rules
  • Whether or not a connector to a third-party tool exists
  • The payment provider's terms

When a link does not exist, no integrator can create it: we say so at the study stage, and we then propose going through import or export if that is possible.

What you are left with

What is written down and handed over

An integration is documented: otherwise nobody can take it over.

Connection inventory

What is connected, what goes through a file, what remains to be studied.

Feasibility study

Link by link, what is possible and on what terms.

Mapping table

How each field in the old system ends up in the new one.

Import file

The cleaned data set, as it was loaded.

Test report

What was checked before the switchover, and the discrepancies corrected.

These documents are produced for the integrations we carry out. Their exact form depends on the scope: it is set in the quote.

Let's identify what needs to be connected, migrated or simplified.

We look at your current environment, we check link by link what is possible, and we write down what is not. Before starting, not after.

Your quote, itemised line by line.

An audit of your workflows, then a quote detailing every item and a rollout schedule set with you.