Projexo Digital
Projexo Caisse
Projexo 360
Your business
Contact
Request a quote Call ES · +34 610 17 50 19Call FR · +33 6 13 77 39 47 info@projexo.solutions

Projexo Caisse

An installation prepared, connected and tested before the first customer.

Projexo prepares the hardware, configures the software and checks every step of the journey before go-live.

What we doPrepare, fit, configure, test
With whomYou, your team, and the providers involved
What you keepA working till and a commissioning report
A technician connecting a POS station on a counter, printer and terminal beside it

How the installation unfolds

Six steps, half of which take place before we arrive at your premises

Most of the work is done off site: that is what shortens the interruption.

  1. Off-site preparation

    The hardware is unpacked, assembled, updated and pre-configured in our premises.

    What comes out of itHardware ready to fit

  2. Delivery

    On the agreed day, at the time that disrupts your business the least.

    What comes out of itThe hardware on site

  3. Connection

    Workstations, printers, drawer, scanner, payment terminal, network.

    What comes out of itPeripherals that respond

  4. Configuration

    Menu or catalogue, prices, VAT, users, rights, print destinations.

    What comes out of itA configuration for your trade

  5. Tests

    A sale, a payment, a return, a closing. All four paths, before leaving.

    What comes out of itA verified journey

  6. Go-live

    The till is open, and we remain reachable for the first few days.

    What comes out of itA commissioning report

Configuration

Nine settings, never the same values

Choose your trade: it is the configuration that makes the difference, not the hardware.

A restaurant, a café, a bar

Nine settings, made before you arrive at the till. They are what makes a receipt come out right and an order go to the right place.

  • The menuDishes, drinks, set menus, and the modifiers that go with them
  • PricesEat in, take away, happy hour if you offer one
  • VATRates by category, and what changes depending on how it is consumed
  • UsersOne account per person, not a shared account
  • RightsWho discounts, who cancels, who reopens a table
  • PaymentsThe connected terminal, the accepted methods
  • PrintersCustomer receipt, production ticket, and their formats
  • Production stationsWhich line goes to the kitchen, which goes to the bar
  • The establishmentCompany name, receipt wording, opening hours
What is checked before leavingA test sale, a test payment, a printed receipt, a closing

A shop, a grocery, a concept store

Nine settings, made before you arrive at the till. They are what makes a receipt come out right and an order go to the right place.

  • The catalogueReferences, size and colour variants, barcodes
  • PricesSelling prices, promotions if you run them
  • VATRates by product family
  • UsersOne account per person at the counter
  • RightsWho discounts, who cancels, who changes a price
  • PaymentsThe connected terminal, the accepted methods
  • PrintersCustomer receipt and shelf labels
  • WorkstationsOne or more counters, and their scope
  • The establishmentCompany name, receipt wording, opening hours
What is checked before leavingA test sale, a test payment, a printed receipt, a closing

A salon, a beauty institute, a spa

Nine settings, made before you arrive at the till. They are what makes a receipt come out right and an order go to the right place.

  • TreatmentsTheir name, their duration, what they require
  • PricesPer treatment, and the packages that group them
  • VATRates on treatments and on retail sales
  • StaffWho works when, and on which treatments
  • RightsWho sees the whole diary, who moves an appointment
  • PaymentsThe connected terminal, the accepted methods
  • PrintersCustomer receipt — and the drawer, connected to the printer
  • ResourcesThe declared treatment rooms, with their constraints
  • The establishmentCompany name, receipt wording, opening hours
What is checked before leavingA test sale, a test payment, a printed receipt, a closing
Two hands setting up a catalogue on a POS tablet mounted on a stand

Before / after

Go-live day

Two ways of opening: the difference is decided in the weeks before.

On arrival

  • The hardware arrives in its boxes, to be unpacked on site
  • The software runs with its factory settings
  • The peripherals are plugged in but never tested together
  • The catalogue is entered while customers wait
  • The team discovers the system on launch day

On leaving

  • The hardware arrives assembled, updated and pre-configured
  • The catalogue, prices and taxes are loaded
  • Every peripheral has been tested on the actual workstation
  • A sale, a payment, a return and a closing have been run through
  • The team has been trained on this configuration

These two columns describe preparation, not a guarantee that nothing unexpected will happen: a network outage or faulty hardware remains possible, and that is when support takes over.

Who does what

An installation is prepared by several parties

What we do, what falls to you, and what depends on a third party: written down beforehand, not discovered on the day.

You

What you provide or approve

  • Access to the premises on the agreed date
  • Power supply and network in place
  • The content of the catalogue or menu, and its sign-off
  • Decisions on rights per user
  • The presence of a manager during the tests

Projexo

What we carry out

  • Off-site preparation of the hardware
  • Fitting and connecting the peripherals
  • Trade-specific configuration, workstation by workstation
  • Sale, payment and closing tests
  • The commissioning report

Publisher or third party

What does not depend on us

  • Electrical or network works, if any are needed
  • Activation of payment methods by the provider
  • Suppliers' delivery lead times
  • Licences granted by the publisher

Electrical and network works are not part of the service: they are identified at the audit and costed separately, by the company carrying them out.

Prices

What is billed, and what is not

Each line is read separately: the installation, the hardware and the licences are not the same item.

Installation and configurationProjexo service, one-off amount
HardwareProjexo quote, line by line
Publisher licencesBilled by the software publisher
Electrical or network worksBy the company carrying them out, if any are needed
TrainingSeparate service, costed separately

The duration of the installation depends on the number of workstations, the peripherals and the data migration. It is set in the quote, after the audit.

What you are left with

What is handed over at go-live

An installation is documented: otherwise nobody can take it over.

Installation plan

Where each workstation is, what is connected to it, and how.

Delivered configuration

The settings applied, category by category.

Accounts and rights

Who has access to what, as decided with you.

Test report

The tests run before leaving, and their result.

Commissioning report

What is in service, what remains to be done, and by whom.

These documents are produced for the installations we carry out: their form depends on the scope, set in the quote.

Let us prepare a go-live that fits your schedule.

We identify what needs to be installed, we prepare the hardware off site and we agree on a date that disrupts your business the least.

Your quote, itemised line by line.

An audit of your workflows, then a quote detailing every item and a rollout schedule set with you.